What has to be decided before the 90 days start

The 90 days only work if the product is ready to sell when they start. Engineering has frozen the specification, the list price and lead time are agreed, and the conformity route is clear. If any of these is still moving, the plan turns into a countdown to a date you will have to move.

In 2027 there is one more reason to check conformity early. The EU Machinery Regulation 2023/1230 applies from 14 January 2027 (Article 54) and repeals Directive 2006/42/EC from that same day (Article 51). Ask whoever handles CE marking which framework applies to your instrument, because it changes the documents you publish at launch.

Whether the market wants the product is a separate question, and it comes first. If you have not answered it yet, run the market analysis, get a go decision from management and then come back to this plan.

Which 2027 trade show to time the launch to

Tie the launch date to a show where your buyers already are. Launching on the opening day gives the press release a reason and sales a place to meet buyers, and it sets a date nobody can push back. The table counts 13 weeks back from each opening day, using the dates the organisers publish, checked on 17 November 2026.

If you start this week, the 90 days end in mid-February, too late for SLAS2027 in San Diego. Analytica, the Munich lab show, does not run in 2027, and its next edition is from 25 to 28 April 2028. For most European instrument makers, the realistic windows in the first half of the year are BPI Europe and ACHEMA.

ACHEMA has a date worth marking. From 15 March 2027, the Monday the 13 weeks would start, cancelling your stand costs 100% of the exhibition fee. Take the go or no-go decision before then. The full calendar of 2027 trade shows also covers BIO, Farmaforum and BioSpain.

2027 trade shows and the week a 13-week launch plan has to start, from the organisers' websites on 17 November 2026.
ShowDates and cityWho you meetWeek 1 starts
SLAS2027

30 January to 3 February, San Diego

Lab automation and screening

31 October 2026, already passed

BIO-Europe Spring

5 to 7 April, Lyon

Biotech, pharma and investors looking for partners

4 January 2027

BPI Europe

27 to 29 April, Hamburg

Bioprocess and manufacturing teams

26 January 2027

ACHEMA

14 to 18 June, Frankfurt

Process and life science industries

15 March 2027

CPHI Frankfurt

9 to 11 November, Frankfurt

Pharma supply chain, with a new lab and analytical equipment zone

10 August 2027

How long before a trade show should a product launch start?

Thirteen weeks is a tight minimum for a mid-sized maker that already has a working unit. It leaves four weeks for message and evidence, five for assets and four for training and meetings. Book the stand much earlier, because ACHEMA lets space on availability and charges 50% of the fees for cancellations between 1 September 2026 and 14 March 2027.

The 13-week launch plan, block by block

Each block ends with something you can check, such as a signed claim sheet or a page ready to publish. If a block slips, cut scope in the next one rather than moving the launch date, because the show will not move.

The order matters more than the speed. Writing the product page before engineering has approved the claims means rewriting it twice, and filming before the figures are fixed means a reshoot when one of them changes.

  • Weeks 1 and 2. A one-line positioning, the three buyer questions the launch must answer, the list price and the target accounts by country.
  • Weeks 3 and 4. Evidence. Test data from your applications lab, the first early users and the claims that engineering and quality will sign off.
  • Weeks 5 to 7. Renders, the demo video shoot, the datasheet and the product page copy, all built from the same approved claims.
  • Weeks 8 and 9. The product page built but hidden, the sales deck, answers to objections, the press release draft and the distributor kit.
  • Week 10. Training for sales and distributors, with the demo unit and the price list.
  • Weeks 11 and 12. Meeting requests to target accounts, the entry in the show's online directory, and ads and emails scheduled.
  • Week 13. Final checks, translations reviewed and the press release under embargo.
  • Launch day and the four weeks after. Page live, demos at the booth and a reply to every contact within the first week.
A woman in a white shirt points at coloured sticky notes arranged on a dark green wall
Thirteen weeks fit on one wall, and each block ends with something the team can check.Photograph by Vitaly Gariev / Unsplash

How much does it cost to launch a lab instrument?

There is no public benchmark for a whole launch. Our prices start at €2,000 for 3 to 5 product renders, €2,500 for a 60 to 90 second explainer video with script, 2D animation and voice-over, and €3,000 for a custom website. At ACHEMA 2027 the minimum 12 m² along a hall wall costs €4,536 for space alone. All prices exclude VAT.

Which launch assets come first and who owns them

Start with the assets everything else is cut from. Approved claims feed the datasheet, the datasheet feeds the product page, and the renders and video feed the page, the booth and sales. The table shows a workable order for a mid-sized maker.

Buyers in GMP plants check the documentation early. EU GMP Annex 15 says equipment should be confirmed against the URS at the vendor site before installation, where applicable, and that FAT may be supplemented by a SAT on site (points 3.5 and 3.7). An outline of how you run both, published with the product, answers that question before it comes up.

If your instructions for use will be digital, treat them as a launch asset. Article 10(7) of Regulation 2023/1230 allows it, but they must be printable and downloadable, stay online for the expected lifetime of the machine and for at least ten years after it is placed on the market, and be sent on paper free of charge within one month if the user asks at purchase.

Plan the video shoot for three uses, the website, the silent booth loop and short clips for sales follow-up. Our guide to filming one equipment demo lists the shots a bioreactor or TFF demo needs and what should stay out of shot.

Launch assets in the order they are usually needed, with the owner and the week they should be ready.
AssetOwnerReady byWhy then
Approved claims and specifications

Product and quality

Week 4

Every other asset copies them

3D renders

Marketing with engineering

Week 6

No finished unit needed, reused everywhere

Demo video

Marketing with applications

Week 7

Needs a working unit and a shot list

Datasheet and product page

Marketing

Week 9

Built from the claims, hidden until launch

FAT and SAT outline

Engineering and quality

Week 9

GMP buyers ask for it before ordering

Digital instructions for use

Engineering

Week 12

Must be online when the first unit ships

Press release and show directory entry

Marketing

Week 12

Go out on launch morning

Want us to check your launch calendar against the show you picked? Leave your details and we will tell you which weeks look tight.

Check my calendar

How to brief sales and distributors before launch day

Sales and distributors should know the product before customers do. Train them in week 10, not in launch week, so they can practise the demo, ask awkward questions and get the material fixed while there is still time.

Give every distributor the same pack. A translated datasheet, the price list with their margin, the demo script, answers to the ten objections your sales team hears most, and a clear rule on who follows up a lead from their country. Keep the launch date under embargo and tell them what they can say before it.

Agree in writing how leads are passed on. A contact from the product page in Germany has to reach the German distributor within a day, with a note of what they asked, or the launch traffic goes cold.

David Monje, founder of crida studio, ran marketing at TECNIC Bioprocess Solutions for three and a half years. There he bridged engineering, product, sales and the distributors in Europe, the Middle East, the Americas and Australia, and international trade shows were his test bench. This plan puts all those teams on one calendar from week 1.

Should we launch at a trade show or online?

Both, on the same day. The show gives sales meetings and press attention, while the product page, the video and an email to your contacts reach the buyers who are not there. An online-only launch can work too, but without a fixed date it tends to slip, so set one anyway.

How to get early-user evidence when customers are under NDA

Launch evidence does not have to name a customer. Data from your own applications lab, run with a protocol you publish, is evidence you control. Show the method, the cell line or process, the scale and the result, and say it was run in-house.

With early users, ask in week 3 what they can share and in what form. Some will accept a quote without their name, a description such as a European CDMO, or a joint poster once their own team has approved it. Get that permission in writing before you design anything around it.

If none of this is ready by week 9, launch with your own data and add the case study without the customer's name later. The wording and the approvals are the same, only the date changes.

What if the product is not ready on time?

Cut scope, not the date, if the product itself is ready. Launch with the renders, the datasheet and the page, and add the video or the case study later. If the unit is not ready to sell, cancel the show launch early and choose the next window in the table, rather than showing a product nobody can order.

Launch week at the show and the numbers that matter

Put the launch on the opening morning and the key demos midweek. At ACHEMA 2024, the opening Monday drew 29,010 visitors and Wednesday 43,137, according to the organiser. The press release and the page go live on Monday, and demos with target accounts go on Tuesday and Wednesday. The figures for each day and how to staff the booth are in our guide to preparing for ACHEMA or CPHI.

Count what shows buying intent, not visits. Demo requests, quote requests, meetings with target accounts and opportunities opened by distributors in the first 30 days tell you whether the launch works. Page views and badge scans only tell you that people noticed.

Set the targets in week 1, together with sales, and review them 30, 60 and 90 days after launch. If the page gets visits but no demo requests, look first at the message and the form, and fix them while the show contacts are still warm.

Do distributors need a demo unit before launch?

They need training and a demo plan before launch, and ideally a demo unit in their main market within the first weeks after it. Without one, they will send every interested lab to you, and the distance slows the sale. Agree in writing who pays for demo units and how long they stay with the distributor.

What to do tomorrow

You can start this week with a handful of decisions and a calendar on one wall. None of the five steps below needs a budget, and together they tell you within a few days whether the show you have in mind is still realistic or whether the next window fits better.

If nobody in the company has the time to run the launch, a fractional marketing director can hold the calendar, chase the weekly deadlines and coordinate engineering, sales, distributors and outside suppliers, so the people who know the product can stay focused on it.

We plan launches like this one, with renders, demo video, the product page and Google Ads, as part of our marketing for biotech and bioprocess companies. The first step is always the same, a calendar with the show date and the thirteen weeks before it.

  • Pick the show, write down the launch date and count 13 weeks back.
  • Name one owner for the launch and one engineer who signs off every claim.
  • List the assets in the table and mark which ones you already have.
  • Ask whoever handles CE marking which framework applies from 14 January 2027.
  • Book the training day for sales and distributors in week 10.

Add crida studio as a preferred source on Google